After one full day's labor, one more layer was gone from the kitchen and dining room. The first layer was drywall and paneling, and the second layer, visible in the first photo but gone in the second, was lap siding. Isaiah, Kellen, and Ashleigh processed it removing large nails (leaving little nails holding some of the 5+ layers of wall paper) and pressure washing before stacking. With three-and-a-half tanks of fuel through the pressure washer, only half the boards were finished.
0 Comments
Leave a Reply. |
Authors
Josh: Founder, father Archives
October 2022
Categories
All
|