After over a year of anticipation, the front door has been replaced with a better insulated and similarly styled (9-lite) door, freeing the solid wood Dutch door to move to the bedroom. Kyra finished cleaning and painting today. We will install it soon.
0 Comments
Chris, pictured below, gave a thumbs up after dry-fitting the pieces of his first cabinet box, EVER. $600 in plywood, paint, glue, router bits, nails, and Chris' tools, and cabinets are materializing. We decided to have a two level counter around the sink, keeping the 4" backsplash. The giant, stainless L-shaped sink in the canopy we used for our kitchen last year was supposed to be the counters, but Kyra's concern about the visual impact prevailed; we now plan on using it in an outdoor kitchen going forward until a full commercial kitchen can be constructed.
It's pretty, secure, and enabling an occupancy permit. Kyra thought it would make a great baby play area. Each spindle along the roof had to be individually measured. One side of the roof was exactly 45 degrees, but the other, sadly, was not, leaving a small gap.... Spindles were from Habitat for Humanity, and they had to be sanded/repainted.
With remarkable swiftness, Chris came up to speed on hardy panel siding installation and bumped up the install quality substantially. We managed to get seams centered over/under doors/windows/roof peak, while maintaining 24" centers for battens (not yet installed) and even fitting a piece perfectly over the plumbing vent under the peak.
Once again, "thank you Chris" is the anthem of the day. And oh the early-May weather.... January through April, 2019, the family teamed up with our God-sent helper Chris (posing in bottom picture), and hired sheetrockers (Jose et al.) to get the sheetrock hung, taped, and textured with the skip-trowel method.
Pulling the 8" insulated ducting through after the drywall was a job suited to Kellen whose size/skill ratio was perfect to crawl through the top of the "A" in the second story pulling a duct. He is pictured standing on my shoulder as he climbed into the ceiling cave.
We began to use the old boards from the garage/shed we tore down in 2017. First we lightly sanded the boards, then routered the edges to be like shiplap and finally covered them with a layer of polyurethane. The boards are so beautiful!
We spent a couple of weeks looking for sheet vinyl and kept coming to dead ends. All the shipping times were 2-3 weeks out and the flooring cost around $3/sq/ft. We wanted the Armstrong, Diamond 10 Technology Premium Sheet Vinyl because of its endurance and warranty. We finally found a rustic wood look, at half the price from Higginsons in Pullman WA, plus installation. We were so excited and now have the flooring done for the kitchen, entry and bathrooms.
|