January through April, 2019, the family teamed up with our God-sent helper Chris (posing in bottom picture), and hired sheetrockers (Jose et al.) to get the sheetrock hung, taped, and textured with the skip-trowel method.
Pulling the 8" insulated ducting through after the drywall was a job suited to Kellen whose size/skill ratio was perfect to crawl through the top of the "A" in the second story pulling a duct. He is pictured standing on my shoulder as he climbed into the ceiling cave.
0 Comments
Leave a Reply. |
Authors
Josh: Founder, father Archives
October 2022
Categories
All
|